Civil engineering

Jamal LNG: Shift camp

In 2013 Velesstroy Company was awarded with subcontract for construction of ambitious and unprecedented project for Russia – “Yamal LNG”. 

Team of Velesstroy employees arrived in Yamal in September 2013. The main task of "landing troop" was the construction of a residential complex for a thousand and a half people. At that time, the living conditions of the company had already become a role model for other companies. 

The first large-scale project that Velesstroy gained is Trained1 and Train 2 - construction of the shift camp at the South Tambey gas condensate field. In 2015 Velesstroy signed a contract with the general contractor "Yamal LNG" OJSC for the construction of III and IV Phases of the project, which was called 3rd and 4th train respectively. 

The sooner than ever within Phase 1 and 2 there were built 38,400 m2 of residential housing for four thousand people and 1,600 m2 of office accommodation. Also, there were constructed outdoor parking, warm parking, fire station, overhead lines and other utilities.
Creating infrastructure of the settlement in the severe arctic conditions is Velesstroy honorable contribution to the development and implementation of unique “Yamal LNG” project.

Map
Quick facts
Client "SOUTH TAMBEY LNG" construction period 2013
Construction works in harsh climate
Manpower - 487